DE IT EN
PrivacyImpressum Sitemap
ARA Pustertal AG
  • Home
  • About us
  • The Plant
  • Reports
  • Partner
  • Contact
ARA TOBL
 
txt_ara-tobl.gif
  • IDA TOBL San Lorenzo di S.
  • Development
    • Why build underground?
    • Geological Positioning
    • Planning and Construction
      • Together, reaching the goal faster
      • Tunnel Construction
      • Constructional Part
      • Mechanical-Technical Installations
      • Electro-technical Installations
      • Measurement and Automatic Control Techniques
      • Process Engineering
    • Construction Expenses, Companies Involved, Planning and Supervision of Construction
  • The Plant
    • Catchment Area and Dimensioning Principles
    • Sewerage System
    • Lay-out Plan / Sketch of Plant
    • Ventilation System
    • For Viewing
    • On-line Regulation
      • On-line Regulation
      • Regulation strategies
      • Operation experience
    • Technical Data
  • Research
    • Topic 1
    • Topic 2
    • Topic 3
    • Topic 4
    • Topic 5
  • Reports
    • IDA TOBL San Lorenzo di Sebato
  • Technical data
    • Performance data
    • Technical data
    • Technical data sewerage system
    • Municipalities
  • Overview
  • Sewage Treatment Line
  • Gas & Sludges Treatment line
  • Sludge dryer
  • Thermal treatment plant
  • Ventilation system
  • Photo Gallery

Electro-technical Installations

- Interconnecting station

- Medium voltage switch controls

- Transformer stations (2 x 630 kVA)

- Low voltage rooms caverns

- Low voltage main distributor (2)

- Low voltage subsidiary distributor (10)

- Cabling (165 km)

- No-break power supply installations with 16 kVA each (2)

- Radio telephone facility

- Fire alarm system

- Gas warning installation (60 gas sensors)

- Pneumatic installation

- Intruder alarm

- Process visualisation and data processing

- Mimic switch diagram in the form of a dynamic big screen

- Optic fibre lines



 
 
 
 
© 2010 ARA Pustertal AG P-IVA: 02524850217  |  TotalCom