| Pump station: |
3 screw conveyor, 800 mm, Tilt angle 33° Qmax 100 l/s |
| Screening plant: |
2-line 1 bar-screen, 1.300 mm Bar spacing: 10 mm; Qmas=1.080 m3/h by 1 screenings wash presses integrated and bagging decive |
| Aerated grit chamber: |
2-line; each line Grit chamber diameter = 5,30 m Volume 50 m³ T = 6 min by Qt Grit washer Qm= 16 l/s |
| Preliminary clarifier: |
1 line, Diameter D = 18,5 m Water depht 2,95 m V = 844 m³…….t = 2,19 h by Qt sludge scraper |
| Biological basin: |
2-linee, each line Water depth T = 5,50 m Aerob basin 1 basin = 620 m³ Anox basin 1 basin (Denitrification) = 413 m³ Aerob 3 basins (Nitrification) = 1.239 m³ 8 pieces Oky diffusers Volume total: Aerob basin 1.240 m³ Denitrification 826 m³ Nitrification 2.478 m³ Total A + VD + VN = 4.544 m³ |
|
2 vertical agitator Recirculation pumps 2 x Q = 190 l/s 3 compressors, each: 3.046 Nm³/h, 90 kW |
| Final clarifier: |
2 basins Circular basin D = 25,60 m Water depht 4,00 m; V = 2 x 2.043 m³ sludge scraper |
| Phosphote precipitation: |
Simultaneous precipitation |
| Quantity of row sludge: |
Row sludge 182 m³/d by 1.500 kg TS/d and 30 m³/d after primary sludge pretreatment |
| Pre-thickeners: |
1 piece Diameter 10 m; Volume = 1 x 350 m³ Rabble rakes, sludge water separation |
| Primary sludge pretreatment: |
Screencloth, Conditioning by Polyetectrolytes Q = 15 m³/h |
| Strainpress: |
Q = 10 m³/h |
| Digestion chambers: |
1 pezzo 1 piece Cylindrical tank D = 12,00 m; H =11,26 m Usable volume = 1.056 m³; Digestion time 50 days Circulation by biogas + pumps |
| Post thickeners: |
1 piece Diameter = 10,00 m; Volume = 1 x 310 m³ Rabble rakes, sludge water separation |
| Gasometer: |
Cylindrical enclosure in steel construction Gas membrane accumulator; Usable volume 300 m³; H = rd. 8,0 m |
| Gas flare plant: |
Capacity = 100 m³/o |
| Gas compressor station: |
2 radial compressors |
| Sludge dewatering: |
1 filter belt press, Conditioning by Polyetectrolytes, Q = 10 m³/h |
| Sludge storage: |
Loaded by screw conveyor |
| Ventilation system: |
Chemical area treatment scrubber From sludge treatment and building: 21.000 m³/h |
| Heating system plant: |
Heating system plant by 2 boiler plants each 115 kW thermal capacity by switching automatically for methane gas or biogas |
| Gas engine plant: |
2 pieces each Ptot = 178 kW; Pel = 60 kW; Pt = 99 kW for propane and biogas |
| Deep well – industrial water: |
2 pieces of pumps, each 11 l/s |