| Emergency screening plant: |
1 bar-screen Bar spacing 3 mm |
| Screening plant: |
2-line 2 bar-screen, Bar spacing: 6 mm; Qmas=1.275 m3/h by 1 screenings wash presses integrated and bagging deceive |
| Aerated grit chamber: |
2-line; each line Grit chamber Cross section 4,51 m² Volume 75 m³ T = 6 min by Qt Grit washer Qm= 20 l/s |
| Preliminary clarifier: |
1 line, Diameter D = 8,00 m Water depht 2,50 m V = 460 m³…….t = 0,59 h by Qt sludge scraper |
| Biological basin: |
2-line, each Line Water depth T = 5,50 m Aerob basin 1 basin = 600 m³ Anox basin 1 basin (Denitrification) = 600 m³ Aerob 3 basins (Nitrification) = 1.800 m³ 6 x 180 pieces membrane diffusers Volume total: Aerob basin 1.200 m³ Denitrification 1.200 m³ Nitrification 3.600 m³ Total A + VD + VN = 6.000 m³ 2 Horizontal agitator Recirculation pumps 2 x Q = 320 l/s 3 compressors, each: 2.400 Nm³/h, 75 kW |
| Final clarifier: |
2 basins Circular basin D = 30 m Water depht 4,05 m; V = 2 x 2.130 m³ sludge scraper |
| Phosphote precipitation: |
Simultaneous precipitation |
| Quantity of row sludge: |
Row sludge 182 m³/d by.500 kg TS/d and 30 m³/d after primary sludge pretreatment |
| Pre-thickeners: |
2 pieces Diameter 7,24 m; Volume = 2 x 140 m³ Rabble rakes, sludge water separation |
| Secondary sludge pretreatment: |
Screencloth, Conditioning by Polyetectrolytes Q = 30 m³/h |
| Strainpress: |
Q = 5m³/o |
| Digestion chambers: |
1 piece Truncated cone: D1 = 13,90 m; D2 = 2,50 m; H = 18,00 m Usable volume = 1.200 m³; Digestion time 60 days Circulation by biogas + pumps |
| Post thickeners: |
2 piedes Diameter = 7,24 m; Volume = 2 x 140 m³ Rabble rakes, sludge water separation |
| Gasometer: |
Pressure tank 25 mbar Usable volume 270 m³; H = rd. 8,0 m |
| Gas flare plant: |
Capacity = 120 m³/h |
| Gas compressor station: |
1 radial compressor |
| Sludge dewatering: |
1 chamber filter press, Conditioning by Polyelectrolytes Q = 20 m³/h |
| Sludge storage: |
Area 100 m² loaded by screw conveyor |
| Liquified gas installation: |
Tank V = 5 m³ by evaporator station |
| Ventilation system: |
Chemical area treatment scrubber + biofilter From sludge treatment: 15.000 m³/h |
| Heating system plant: |
Heating system plant by 1 boiler plants each 411 kW thermal capacity by switching automatically for methane gas or biogas |
| Gas engine plant: |
2 pieces each: Ptot = 163 kW; Pel = 55 kW; Pt = 90 kW for propane and biogas |
| Deep well – industrial water: |
2 pieces of pumps, each 20 l/s |